Electric Heating Industrial Boiler Steam Generator for Steam Generation
1.The electric heating steam generator adopts automatic operation with intelligent control system: automatic water refill, water shortage alarm, automatic stop to pressure, automatic opening below the set pressure, overheating protection and automatic fault detection, etc. The heating system uses stainless steel electric heating pipe, high thermal efficiency, the maximum temperature is up to 170°, durable.
2. Steam generator design and structure
(1) Production according to the standard of class c boiler
(2) Energy conservation and environmental protection,national exemption from supervision and inspection
(3) Automatic water replenishment at low water level
(4) Overpressure protection
(5) Water shortage protection
3.Steam generator protection function
(1) Components of the main electric control cabinet are selected from the domestic famous brands
(2) Pressure limit automatic control device
(3) Automatic overpressure discharge of the safety valve
(4) Power supply fault phase-protection function
(5) The circuit system is waterproof, moisture-proof and shock-proof
NO.
|
Item |
Model |
|
|
48kw |
72kw |
144kw |
216kw |
360kw |
1. |
Model and Specifications |
48KW/380V/0.7MPa |
72KW/380V/0.7MPa |
144KW/380V/0.7MPa |
216KW/380V/0.7MPa |
360KW/380V/0.7MPa |
2. |
Steam capacity |
70kg/h |
100kg/h |
200kg/h |
300kg/h |
500kg/h |
Product name |
Model |
Gas capacity |
Unit |
Quantity |
Fully automatic electric heating steam generator |
72KW/380V/0.7MPa |
100kg/h |
set |
1 |
Detailed list of product internal accessories: |
Inner liner: special steel for Q245R boiler |
2set |
Note: Detailed list of product internal accessories.(The style is subject to the actual situation)
|
Box body: durable imported spray plastic shell |
2set |
High temperature gear water pump |
2set |
Safety valve |
2pcs |
Ball valve: (pollution discharge) model QHF-25.64 applicable temperature 40-180 degrees. Applicable medium: water, oil and gas. |
2pcs |
Pressure gauge: Model y-60 specification 0.7 mpa |
2pcs |
Three point water level gauge |
2pair |
Check valve: 20MM2 |
4pcs |
Pressure controller: Model Q-60 specification 0.7 mpa |
2pcs |
Electrical control |
2set |
Contactor |
4pcs |
Probe control: three-point water level probe |
6pcs |
Electric heating tube |
6pcs |
Steam outlet valve (DN20): 304 stainless steel, applicable temperature 40-180 degrees |
2pcs |
The steam volume can be customized according to the demand of 30kg-1 ton.Steam outlet may be linked together for a steam outlet. |
1. The warranty period of the company's products shall be 12 months from the date of signing the contract (the boiler body is within the scope of warranty, and other man-caused or irresistible factors are not within the scope of warranty).
2. According to the after-sales service tracking card, the service department of our company will take telephone tracking service to timely understand the operation dynamics of our company's products and protect the interests of users.
3. The service department and technology department of our company will train the steam generator management operators of the user in all maintenance operation techniques on the equipment of our company.
4, after the normal use of the steam generator to the warranty period, the steam generator and program control failure (non-human factors), only reasonable accessories fees are charged.