Customization: | Available |
---|---|
After-sales Service: | Lifelong Technical Service |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Microwave disinfection treatment system is an integrated equipment, the equipment at least by automatic feeding unit, airtight bin unit, multi-function airtight crushing unit, negative pressure pumping unit, microwave disinfection sterilization bin unit, microwave generator unit, steam heating system, discharging unit, automatic control unit, waste gas treatment unit 10 units and alarm system.
Microwave sterilization is the result of the joint action of microwave thermal effect and biological effect,so that microwave can directly interact with bacteria,fast sterilization.
1.The thermal effect of microwave energy:under the action of a certain intensity of microwave field,bacteria will absorb microwave energy due to the polarization of molecules,thus making Protein and Physiologically active substance deforms and loses its biological activity.The thermal effect of microwave mainly plays the role of rapid warming and sterilization.
2.Non-thermal effect of microwave energy:the high frequency electric field changes the structure of polarized molecules,leading to protein and physiological active substances in the microbial body mutation and loss of vitality or death,in the sterilization of conventional physical sterilization has no special role.
No. | System unit | Item | Technical Parameters | ||
Model | ZT-MWT-3000 | ZT-MWT-5000 | ZT-MWT-10000 | ||
1 | Hoisting System |
Garbage can | 660L | 660L | 660L |
Power source | 4kw hydraulic system |
4kw hydraulic system | 4kw hydraulic system | ||
Material | Stainless steel | Stainless steel | Stainless steel | ||
2 | Stock bin | Volume | 1m³ | 1.2m³ | 1.2m³ |
Material | Stainless steel | Stainless steel | Stainless steel | ||
Eccentric swage |
Equipped | Equipped | Equipped | ||
3 | Crushing system | Power | 22kw | 30kw | 30kw |
Blade | Φ345*30 D550 | Φ345*30 D550 | Φ345*30 D550 | ||
4 | Sterilization chamber | Power | 2.2kw | 3kw | 3kw |
Chamber size | 530-5000 | 530-6000 | 530-8500 | ||
Mirowave generatior | 1.1kw*8 | 1.1kw*10 | 1.1kw*20 | ||
5 | Discharge screw | Power | 3kw | 3kw | 3kw |
6 | Main body dimension (excluding hoist and discharge screw) | 7000*2900*2650 | 8000*2900*2650 | 10500*290*2650 | |
7 | Supporting facility | Steam generator, water chiller, water softener, electric control box, exhaust equipment (optional), etc | |||
8 | Total power | 97kw | 130kw | 176kw | |
9 | Total Weight | 11000kg | 13000kg | 15000kg | |
10 | Capacity(t/h) | 3 | 5 | 10 |
ZHITE Environmental Protection Technology Co., Ltd.is a comprehensive domestic enterprise with integrating scientific research and development,engineering design,production and installation and commissioning services.
The main products are medical waste treatment equipment,diseased livestock and poultry harmless treatment equipment,household waste treatment equipment,kitchen waste treatment equipment,tail vegetable treatment equipment,sludge treatment equipment and all kinds of shredding equipment and other solid waste treatment products. Also can design and customize all kinds of efficient and practical equipment and production lines according to customer needs.
FAQ
1 | Q: Are you a factory or trading company? A: Manufacturer with own trading company. Welcome to take a visit! |
2 | Q: How to choose a shredder machine? A: With our technial consulting services,we can help you choose the most suitable machine and program based on your specific needs and site requirements. |
3 | Q: How about the service? A: We provide after-sales service,including on-site installation ,commissioning equipment ,guidance and training of operators etc.Make regular retum visits to solve your equipment problems and optimize your equipment maintenance methods. |
4 | Q: How long is your delivery time? A: Generally,it will be about 20-35 working days after deposit. |
5 | Q: How do you ensure the quality? A: You can send your sample scrap materials to us and we will test the machine for you without charging the fees.And we can send you the test video.According to your time ,you can take a visit to our factory and test your machine. |
6 | Q: Is your price competitive? A: Surely we will give you best factory price based on superior product and service. |