Customization: | Available |
---|---|
Function: | Water Boiler, Steam Boilers, Hot Water Boiler |
Fuel: | Gas-Fired |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The new environment-friendly gas (oil) steam generator developed by our company does not need to apply for approval procedures, does not need annual inspection, can be installed easily, can choose liquefied gas, natural gas or light diesel as fuel.using three return combustion mode, low fuel consumption, thermal efficiency can reach more than 98%, with automatic control system and related safety devices, automatic interlocking control, Safe and reliable, fast steam out, steam pressure up to 0.7Mpa, can meet the food processing, biological chemicals, washing and ironing and other most of the use of steam industries.
No. | Name | Oil (gas) steam generator |
1 | Model | ZTSG0.2T-0.7-Y(Q) |
2 | Brand | Zhite |
3 | Quantity | 1set |
4 | Measured evaporation | 200KG/h |
5 | Rated working pressure | 0.7MPA |
6 | Fuel | Light diesel, liquefied gas, natural gas |
7 | Boiler thermal efficiency | ≥98% |
8 | Normal water volume | 48.7L |
9 | Fuel consumption/h | 12KG(Light diesel) |
14NM3(natural gas) | ||
10KG(liquefied gas) | ||
10 | Inlet Diameter | DN20 |
11 | Main blowdown diameter | DN40 |
12 | Waste heat recovery blowdown diameter | DN25 |
13 | Steam outlet diameter | DN25 |
14 | Safety valve diameter | DN25 |
15 | Chimney diameter | Φ219 |
16 | Overall dimensions of boiler body (including burner) | 2100*1400*2300mm |
17 | Total shipping weight of goods(1set) | 1000KG |
18 | Control system model | Fuel oil (gas) steam generator specialized |
19 | Power | 220V 50HZ |
1. Our equipment is made of famous brand accessories. Such as Chint appliances,Leo pump,Yinniu fan.
2, our boiler liner has formal procedures (1 liner 1 set of procedures),material is Q245R boiler special steel,thickness is national standard size 8 inside 6 outside, high thermal efficiency. some manufacturers welded their own inner liner (size of 3 and a half to 4)Burn out easily, in order to save costs and jerry-building, generally a year and a half or two years will burn through, and the liner after all belongs to the pressure vessel, once the safety problems will cause loss of interests and personal injury.
3, if equipment have quality problems during working time, we have 12 after-sales technicians, door-to-door service the first time .
Steam generator safety instructions
1. Pressure protection
Equipped with pressure gauge and pressure controller, accurately control the furnace pressure, according to the customer's use of pressure requirements to define the pressure interval, automatic stop to the pressure, low pressure automatic start. Two mechanical safety valves are connected to the top of the furnace liner, 8kg pressure protection, up to 8kg pressure valve open pressure relief.
2. Temperature protection
The inner wall of the furnace is connected with a set of temperature monitoring system to monitor the furnace temperature in real time. The factory default temperature protection is 240 degrees. When the temperature exceeds 240 degrees, the system will stop operation in an emergency and all lines of the equipment will be powered off.
3. Water protection
Equipped with the latest version of the three-point water level gauge, which has three built-in probes for high, middle and low levels to monitor the water level in real time. When the water level reaches the low level, the system automatically replenishes water. The furnace will not dry burn due to water shortage during use.
4. Circuit protection
The equipment electric box is equipped with leakage protector and AC contactor to protect the circuit and equipment. All electric appliances are made of Chint, with long service life and low failure rate.
5. Fault protection
The equipment adopts GPRS Internet computer controller, which can monitor the running state of the system in real time. If the running state is abnormal, the system will stop automatically.
1. The warranty period of the company's products shall be 12 months from the date of signing the contract (the boiler body is within the scope of warranty, and other man-caused or irresistible factors are not within the scope of warranty).
2. According to the after-sales service tracking card, the service department of our company will take telephone tracking service to timely understand the operation dynamics of our company's products and protect the interests of users.
3. The service department and technology department of our company will train the steam generator management operators of the user in all maintenance operation techniques on the equipment of our company.
4, after the normal use of the steam generator to the warranty period, the steam generator and program control failure (non-human factors), only reasonable accessories fees are charged.